Studio Construction: End of Week Four
/As you can tell from the photos below, the exterior of the addition has been painted and the roof and door have been installed. Inside the studio, three separate electrical circuits have been installed - one for recording equipment, one for playback equipment, and one for everything else (computer, hard drives, etc.).